Client Projects
Delivered engineering across transmission and solar projects
2000km+UK National Grid
Case study 1
UK National Grid 2000km, 400kV, 275kV and 132kV line modelling contract. Modelled 3D PLS CADD line models from LiDAR survey data, Ambient weather data, Conductor loading data and other data provided by the customer. For Vegetation intrusion detection in the UK National Grid Assets Management program, different conductor scenarios were generated (75DegC, 15DegC+500Pa) from the developed line thermal models.
Delivery outcomes

Tennet (Netherlands)
Case study 2
Tennet (Netherlands) 380kV, 150kV and 110kV line modelling contract. Modelled 3D PLS CADD line models from LiDAR survey data, Ambient weather data, Conductor loading data and other customer data. Generated different conductor scenarios (75DegC, 15DegC+500Pa, 40DegC) from the developed line thermal models for the purpose of Vegetation intrusion detection in the Tennet Assets Management program.
Delivery outcomes
600km+Elia (Belgium)
Case study 3
Modelled 3D PLS CADD line models from LiDAR survey data, Ambient weather data, Conductor loading data and other customer-provided data. Generated different conductor scenarios (75DegC, 15DegC+500Pa and 40DegC) from the developed line thermal models for Vegetation intrusion detection in the Elia Asset Management program.
Delivery outcomes
Solar cable designSunkean solar cable support design
Case study 4
Hika Design prepared PLS CADD design inputs for the catenary cable support system at a solar installation. The work covered end and intermediate pier duties, sustained loading and ultimate wind cases across the required wind directions.
Delivery outcomes